E-Summary for stages with limited set of electrical tests should be filled with -1
Currently for stages where only a limited number of electrical tests can be pushed such as PARYLENE_UNMASKING, the resulting E-SUMMARY is missing some informations which are mandatory to be filled by PDB.
As a result, no E-SUMMARY from PARYLENE_UNMASKING stage can be pushed from localDB to PDB at the moment.
Same is probably true for WIREBOND_PROTECTION, THERMAL_CYCLES, LONG_TERM_STABILITY_TEST