MC Job Options merge requestshttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests2024-03-14T15:51:48+01:00https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2957MGPy8 UPC ALPmumu2024-03-14T15:51:48+01:00Jan KretzschmarMGPy8 UPC ALPmumuMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLHI-531
logParser flags missing TestHEPMC (special setup), therefore CI has to be skipped
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2956pMSSM models for 3G scan2024-03-15T08:28:12+01:00Yang LiupMSSM models for 3G scanMake sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11113
## Checklist for approval
This...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11113
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2954JOs for X->HH->bbll signal2024-03-13T18:09:28+01:00Marisilvia DonadelliJOs for X->HH->bbll signalMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11116
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Marisilvia DonadelliMarisilvia Donadellihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2953PowhegPythia8 W and Z jO refresh for precision W,Z2024-03-12T17:31:45+01:00Jan KretzschmarPowhegPythia8 W and Z jO refresh for precision W,ZMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11141
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2952Renaming PP8 ttbb allhad recoil syst joboption2024-03-12T11:33:37+01:00Katharina VossRenaming PP8 ttbb allhad recoil syst joboption## Description of bug
Previous name of job option contained "allhd" instead of "allhad". Samples with "allhad" are easier to find with e.g. rucio.
JIRA ticket in which these samples were requested is: https://its.cern.ch/jira/browse/ATL...## Description of bug
Previous name of job option contained "allhd" instead of "allhad". Samples with "allhad" are easier to find with e.g. rucio.
JIRA ticket in which these samples were requested is: https://its.cern.ch/jira/browse/ATLMCPROD-11088
## Changes introduced
Renaming of file, replacing "allhd" with "allhad"
## Tests
PHYSHORT field "PhPy8EG_A14_NNPDF31_ttbb_4FS_pTdef1_allhad_dpl_rcl" has not more than 50 characters (instead exactly 50 characters).
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2950Run3 4tops at LO2024-03-13T23:32:51+01:00Lucia KeszeghovaRun3 4tops at LOMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10679
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2949Update ggH and bbH H->4l JO at 13.6TeV: n input files, Nfinal and shower sett...2024-03-13T18:45:14+01:00Ana Rosario Cueto GomezUpdate ggH and bbH H->4l JO at 13.6TeV: n input files, Nfinal and shower settings## Description of bug
Update ggH and bbH H->4l JO at 13.6 TeV. The affected ticket is ATLMCPROD-11085
## Changes introduced
The number of input LHE files, the Nfinal settings and the shower settings were changed
## Tests
## Issues reso...## Description of bug
Update ggH and bbH H->4l JO at 13.6 TeV. The affected ticket is ATLMCPROD-11085
## Changes introduced
The number of input LHE files, the Nfinal settings and the shower settings were changed
## Tests
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2948VH(bb/cc) leptonic decay of vector boson MC23 shower JOs for Pythia82024-03-25T11:37:57+01:00Stephen JigginsVH(bb/cc) leptonic decay of vector boson MC23 shower JOs for Pythia8Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11128
## Checklist for approval
Thi...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11128
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Spyros ArgyropoulosSpyros Argyropouloshttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2947Rebase before checking grid size2024-03-11T15:51:08+01:00Spyros ArgyropoulosRebase before checking grid size## Description of bug
```
changed=($(git diff-tree --name-only -r origin/master..HEAD --diff-filter=A | grep 'GRID.tar.gz'))
```
without pulling from master was used in `check_grid_size.sh` which means that if other GRID files were merg...## Description of bug
```
changed=($(git diff-tree --name-only -r origin/master..HEAD --diff-filter=A | grep 'GRID.tar.gz'))
```
without pulling from master was used in `check_grid_size.sh` which means that if other GRID files were merged into master after the branch was branched off they would be picked up.
## Changes introduced
Pull from master before checking grid files (as done in `check_modified_files`)
## Tests
## Issues resolved
Closes #Spyros ArgyropoulosSpyros Argyropouloshttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2946Change in nFinal for ggH [skip modfiles]2024-03-12T15:43:48+01:00Marisilvia DonadelliChange in nFinal for ggH [skip modfiles]## Description of bug
Wrong number of final state particles in event are causing crash.
## Changes introduced
`nFinal=-1` and the tune changed from AZNLO to A14 in ggH JOs.
## Tests
For reference, the advice from the experts can ...## Description of bug
Wrong number of final state particles in event are causing crash.
## Changes introduced
`nFinal=-1` and the tune changed from AZNLO to A14 in ggH JOs.
## Tests
For reference, the advice from the experts can be seen in ATLMCPROD-10955.
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2944Grid extension for H to 2s to 4b for DV+MET2024-03-12T09:48:18+01:00Yang LiuGrid extension for H to 2s to 4b for DV+METMake sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11108
## Checklist for approval
This...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11108
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2943PP8 ttbb allhad pThard and recoil syst2024-03-07T14:41:35+01:00Katharina VossPP8 ttbb allhad pThard and recoil systMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11088
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2942add missing file for 5375482024-03-06T22:00:58+01:00Yang Liuadd missing file for 537548## Description of bug
Still the CO file is missing in 537548 due to a wrong file link.
## Changes introduced
Add missing CO for 537548
## Tests
## Issues resolved
Closes ### Description of bug
Still the CO file is missing in 537548 due to a wrong file link.
## Changes introduced
Add missing CO for 537548
## Tests
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2941Sherpa3 validation: provide EL9-compatible ref files using 2.2.14 with Gmu sc...2024-03-06T11:38:40+01:00Christian GutschowSherpa3 validation: provide EL9-compatible ref files using 2.2.14 with Gmu schemeMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
AGENE-2217
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2940ParticleGun monopole jO2024-03-27T10:59:21+01:00Jan KretzschmarParticleGun monopole jOMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLHI-529
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2939TT -> blvN1 4b-body strong SUSY2024-03-05T21:15:25+01:00Nathan Jihoon KangTT -> blvN1 4b-body strong SUSYMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11084
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2938update Long lived chargino CO to suit for Run3 production2024-03-18T03:10:43+01:00Yang Liuupdate Long lived chargino CO to suit for Run3 production## Description of bug
CO not suitable for Run3 production
## Changes introduced
Add beam energy to the setting so that it can suit for the run3 production
## Tests
## Issues resolved
Closes ### Description of bug
CO not suitable for Run3 production
## Changes introduced
Add beam energy to the setting so that it can suit for the run3 production
## Tests
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2937Fixing include [skip modfiles]2024-03-03T17:56:32+01:00Marisilvia DonadelliFixing include [skip modfiles]## Description of bug
There was an error in the JO `include`, a leftover from the local tests. JIRA-11087
## Changes introduced
It was:
`include('../603200/PhPy8EG_Haa_2mu2tau_maX.py')`
Now one reads:
`include('PhPy8EG_Haa_2mu2tau_ma...## Description of bug
There was an error in the JO `include`, a leftover from the local tests. JIRA-11087
## Changes introduced
It was:
`include('../603200/PhPy8EG_Haa_2mu2tau_maX.py')`
Now one reads:
`include('PhPy8EG_Haa_2mu2tau_maX.py')`
## Tests
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2936MC23 H->yy ggH and ttH signal samples2024-03-06T09:26:21+01:00Shu LiMC23 H->yy ggH and ttH signal samplesMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11107
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2935Long lived chargino production grid request for Run 2 and Run 32024-03-01T04:51:27+01:00Yang LiuLong lived chargino production grid request for Run 2 and Run 3Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11077
## Checklist for approval
This...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11077
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.