MC Job Options merge requestshttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests2024-03-13T19:26:03+01:00https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2955Request for signal samples Z' -> bb with ISR2024-03-13T19:26:03+01:00Yiming AbulaitiRequest for signal samples Z' -> bb with ISRMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11112
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2951mc20 & mc23 signal requests for highmass dilepton search2024-03-15T15:15:49+01:00Yiming Abulaitimc20 & mc23 signal requests for highmass dilepton searchMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11102
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2945VH(bb/cc) leptonic decay of vector boson MC23 shower JOs2024-03-11T17:15:17+01:00Stephen JigginsVH(bb/cc) leptonic decay of vector boson MC23 shower JOsMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
Thi...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2919Herwig Lund2024-02-22T17:14:39+01:00Haifeng LiHerwig LundMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10870
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2914Wprime2024-02-21T16:42:29+01:00Haifeng LiWprimeMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10983
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2905JOs for tta(bb) H7 signal2024-02-23T14:20:15+01:00Marisilvia DonadelliJOs for tta(bb) H7 signalMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11072
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Marisilvia DonadelliMarisilvia Donadellihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2890jO for ttbb evgen sample2024-02-09T22:04:12+01:00Lucia KeszeghovajO for ttbb evgen sampleMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11071
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2881Wprime2024-02-21T16:03:58+01:00Haifeng LiWprimeMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10983
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Haifeng LiHaifeng Lihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2880ggH NNLOPs missing HGam_batch32024-02-07T11:34:41+01:00Ana Rosario Cueto GomezggH NNLOPs missing HGam_batch3Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11001
ATLMCPROD-**{\*PLEASE FILL THIS\*}**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2874VH(bb/cc) leptonic decay of vector boson MC23 shower JOs2024-03-08T15:19:28+01:00Stephen JigginsVH(bb/cc) leptonic decay of vector boson MC23 shower JOs## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repos...## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2835jO for EFT high-mass ttll sample2024-01-20T17:18:16+01:00Lucia KeszeghovajO for EFT high-mass ttll sampleMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
[ATLMCPROD-11026](https://its.cern.ch/jira/browse/ATLMCPROD-11026)
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2816MG WWW EFT for Run22024-01-09T12:41:41+01:00Tairan XuMG WWW EFT for Run2Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10914
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2812Extension of exotics Prompt HNL request2024-01-05T16:59:59+01:00Yiming AbulaitiExtension of exotics Prompt HNL requestMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11005
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2801JOs for boosted resonant VBF HH->bbbb using Composite Higgs Model2023-12-16T20:08:55+01:00Marisilvia DonadelliJOs for boosted resonant VBF HH->bbbb using Composite Higgs ModelMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-**10935**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Marisilvia DonadelliMarisilvia Donadellihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2798Run 3 JOs for VBF HH->4b2023-12-15T21:15:45+01:00Marisilvia DonadelliRun 3 JOs for VBF HH->4bMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10960
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Marisilvia DonadelliMarisilvia Donadellihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2789MC23 Z'->ll signal request at 13.6 TeV2023-12-12T20:00:34+01:00Yiming AbulaitiMC23 Z'->ll signal request at 13.6 TeVMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10974
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2777Powheg Dijet Slices w/ Nuclear PDFs -- LHE Production2023-12-11T16:00:42+01:00Matthew Caleb HoppeschPowheg Dijet Slices w/ Nuclear PDFs -- LHE ProductionMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLHI-455
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2771pThard1_tW_DR_dyn_with_new_LHE2023-12-05T08:49:48+01:00Qibin LiupThard1_tW_DR_dyn_with_new_LHEMake sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-**10881**
## Checklist for approval
...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-**10881**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
* [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
* [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
* [x] The request has been approved by the PA/CP group
* [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
* [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
* [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
* [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
* [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
* [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2759VBF Hbb + Hcc Run 2 Pythia8+EvGen2024-02-09T07:50:51+01:00Daniela RebuzziVBF Hbb + Hcc Run 2 Pythia8+EvGenMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10934
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2734MC23 Herwig H->4l and H->mumu2024-02-17T11:27:39+01:00Shu LiMC23 Herwig H->4l and H->mumuMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10851
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)