MC Job Options merge requestshttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests2024-03-27T04:05:45+01:00https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2979R23 Run2 & Run3 signal request for ISRC1C1 and ISRC1N22024-03-27T04:05:45+01:00Yang LiuR23 Run2 & Run3 signal request for ISRC1C1 and ISRC1N2Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11090
## Checklist for approval
This...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11090
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/297613.6 TeV gridpack for tWZ, Z->ll with DR22024-03-22T21:48:14+01:00Lucia Keszeghova13.6 TeV gridpack for tWZ, Z->ll with DR2Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11145
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2974Heavy vector triplet, DarkJets, 3-prong signals2024-03-25T04:40:01+01:00Yi YuHeavy vector triplet, DarkJets, 3-prong signalsMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11119
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2972Heavy vector triplet, DarkJets, 3-prong signals2024-03-20T13:31:49+01:00Yi YuHeavy vector triplet, DarkJets, 3-prong signalsMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-**{\*PLEASE FILL THIS\*}**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2971Heavy vector triplet, DarkJets, 3-prong signals2024-03-19T17:41:21+01:00Yi YuHeavy vector triplet, DarkJets, 3-prong signalsMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-**{\*PLEASE FILL THIS\*}**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2968pMSSM models for 3G Bino scan2024-03-19T13:30:14+01:00Yang LiupMSSM models for 3G Bino scanMake sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11120
## Checklist for approval
This...Make sure that all the items in the checklists are duly followed:\
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-11120
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).\
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2962update gammajet herwig JOs2024-03-18T17:00:05+01:00Haifeng Liupdate gammajet herwig JOs## Description of bug
Fixed warning messages in JOs. The log file from JOs are quite large and the evgen job will use lots of disk space when running the job in node computer. That's why it should be fixed. The previous JOs haven't been...## Description of bug
Fixed warning messages in JOs. The log file from JOs are quite large and the evgen job will use lots of disk space when running the job in node computer. That's why it should be fixed. The previous JOs haven't been used for any production.
## Changes introduced
Herwig7Config.run(shower_var=False)
## Tests
Have tested them locally. The extra warning messages are not there anymore.
## Issues resolved
Sovled
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2955Request for signal samples Z' -> bb with ISR2024-03-13T19:26:03+01:00Yiming AbulaitiRequest for signal samples Z' -> bb with ISRMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11112
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2951mc20 & mc23 signal requests for highmass dilepton search2024-03-15T15:15:49+01:00Yiming Abulaitimc20 & mc23 signal requests for highmass dilepton searchMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11102
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [x] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [x] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [x] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [x] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [x] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Yiming AbulaitiYiming Abulaitihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2945VH(bb/cc) leptonic decay of vector boson MC23 shower JOs2024-03-11T17:15:17+01:00Stephen JigginsVH(bb/cc) leptonic decay of vector boson MC23 shower JOsMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
Thi...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2920Cleaning up keywords not accepted in rel23.6 [skip modfiles]2024-02-23T11:27:50+01:00Marisilvia DonadelliCleaning up keywords not accepted in rel23.6 [skip modfiles]## Description of bug
bbll, bbtautau, bbZZ and bbWW keywords not recognised in rel 23.6.24, being used for HH>bbll trigger studies.
## Changes introduced
The above-mentioned keywords were removed.
## Tests
Validation plots:
http...## Description of bug
bbll, bbtautau, bbZZ and bbWW keywords not recognised in rel 23.6.24, being used for HH>bbll trigger studies.
## Changes introduced
The above-mentioned keywords were removed.
## Tests
Validation plots:
https://docs.google.com/presentation/d/1ykNIu1PBfyXuYKELGWFvhFCzDjfdZTtTjP4igu7g1oY/edit#slide=id.g2bb3d6bb213_0_0
JOs and log generate files:
https://cernbox.cern.ch/files/link/public/Nhd92AuYl2iLSnb?tiles-size=1&items-per-page=100&view-mode=resource-table
## Issues resolved
Closes #Dominic HirschbuehlAna Rosario Cueto GomezDominic Hirschbuehlhttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2919Herwig Lund2024-02-22T17:14:39+01:00Haifeng LiHerwig LundMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10870
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2914Wprime2024-02-21T16:42:29+01:00Haifeng LiWprimeMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10983
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2905JOs for tta(bb) H7 signal2024-02-23T14:20:15+01:00Marisilvia DonadelliJOs for tta(bb) H7 signalMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11072
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)
- [ ] Check that the ATLMCPROD link provided in "JIRA ticket" field above works and that a working link pointing to this MR is posted on the corresponding JIRA page. If not contact the package maintainers.Marisilvia DonadelliMarisilvia Donadellihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2890jO for ttbb evgen sample2024-02-09T22:04:12+01:00Lucia KeszeghovajO for ttbb evgen sampleMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11071
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2881Wprime2024-02-21T16:03:58+01:00Haifeng LiWprimeMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10983
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)Haifeng LiHaifeng Lihttps://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2880ggH NNLOPs missing HGam_batch32024-02-07T11:34:41+01:00Ana Rosario Cueto GomezggH NNLOPs missing HGam_batch3Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-11001
ATLMCPROD-**{\*PLEASE FILL THIS\*}**
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2874VH(bb/cc) leptonic decay of vector boson MC23 shower JOs2024-03-08T15:19:28+01:00Stephen JigginsVH(bb/cc) leptonic decay of vector boson MC23 shower JOs## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repos...## JIRA ticket
ATLMCPROD-10752
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [ ] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [ ] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2835jO for EFT high-mass ttll sample2024-01-20T17:18:16+01:00Lucia KeszeghovajO for EFT high-mass ttll sampleMake sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
[ATLMCPROD-11026](https://its.cern.ch/jira/browse/ATLMCPROD-11026)
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [ ] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [x] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [x] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)https://gitlab.cern.ch/atlas-physics/pmg/mcjoboptions/-/merge_requests/2816MG WWW EFT for Run22024-01-09T12:41:41+01:00Tairan XuMG WWW EFT for Run2Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket n...Make sure that all the items in the checklists are duly followed:
follow the instructions of each checklist item and report potential issues to the repository mainteners.
## JIRA ticket
<!-- Fill the line below with the JIRA ticket number, e.g. ATLMCPROD-1234 -->
ATLMCPROD-10914
## Checklist for approval
This checklist should be normally filled by MC contacts (but it can also be done by the person opening the merge request).
If something is unclear get in touch with the repository maintainers.
- [x] I have followed the [guidelines in McSampleRequestProcedure](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/McSampleRequestProcedure)
- [x] I have provided the ATLMCPROD JIRA ticket where the request has been discussed
- [x] The request has been approved by the PA/CP group
- [ ] The pipeline has run and the status is green (still check the CI job output - if you see any errors report to the repository maintainers)
- [ ] If the pipeline is orange: check the CI job output to sort out the issues. If the issue is unclear contact the repository maintainers
- [ ] CI jobs have not been skipped (if jobs have been skipped, the requesters should provide a reason for skipping and confirmation from the PMG conveners is necessary before merging)
- [ ] Check that no `log.generate.short` files are included in the commit to be merged to master. If such files are present, it indicates that something went wrong in the pipeline. Check the job logs and contact the package maintainers if needed.
- [ ] Check that the title of the MR is descriptive enough (if not ask the requester to modify it)
- [ ] Check that the DSID range assigned is correct (500000-999999) and corresponds to [right generator block](https://twiki.cern.ch/twiki/bin/view/AtlasProtected/PmgMcSoftware#DSID_blocks)