Skip to content

GE11-M-03L1: HV sector possible disconnected in etaP1

This HV sector is close to the edge so it should be confirmed with an efficiency measurement with smaller fiducial cuts.

To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information