VTRx OH134
On April 1st of 2021, the RSSI current was monitored for the VTRx in GBT0, GBT1, and GBT2, of OH134 in detector GE11-X-S-PAK-0003 (Top layer SCS027 extracted from P-17@P5). The GBT2 of this chamber was unstable.
OH-0134 was modified in-situ with SMD resistor and a jumper wire in order to measure RSSI through the SCA, but it was not possible to monitor VTRx2.
VTRx1 and VTRx2 were carefully Swapped, and after 24h of monitoring a "Bad" RSSI behavior was observed.