New asymmetric optics to minimise dispersive contribution
Adding new HiRadMat optics for STI experiment
Operational models up to LHC (including TI2 and TI8) as in operation in 2021
TI lines sequences updated using files from LDB, but with corrections.
Added D3 line for all TT2 optics from the PS.
Fix for SPS extraction lines
Quick fix of DVT40 in PSB injection stitched model
Uploaded tested JMAD model for PSB injection
Added LBE to PSB injection (just to allow operational model to work)
New release adding all SPS extraction stitched models (except for SFTION)
Hot fix for PSB injection model - missing BSW settings from PSB-repo
Significant change for JMAD at SPS injection, DI line and PS extraction stitched models
Added many JMAD models: - PSB injection - PSB extraction - ELENA
Before uploading new optics for PSB extraction in LSA PRO