Skip to content

PRW PeriodAssignments support for AnalysisTop

Tomas Dado requested to merge tdado/athena:21.2-PRWPeriodAssignments into 21.2

Added option to manually specify the run periods for the PRW tool via the AT config file. If the parameter is not set, the default is used. This is needed to run on 5 TeV datasets as the corresponding runNumbers are not in the PRW tool defaults.

Related JIRA ticket: ANALYSISTO-739

Edited by Tomas Dado

Merge request reports

Loading