Skip to content
Snippets Groups Projects

Add inside-out muon reco to trigger new JO test

Merged Savanna Shaw requested to merge sshaw/athena:muon-newjo into master

Adding the inside-out reco to the muon triggers in the new JO test (ATR-20388):

  • Add the inside-out reco algorithms to the muon trigger configuration, and run in a sequence only if we don't find any muons in the outside-in reco sequence
  • Add the configuration for the algorithms that check for outside-in muons and merges the muon trigger containers
  • Update the muon reco config to remove a couple cases of unneeded 'addPublicTools' and to use the correct track summary tool for a given use case (CombinedMuonTrackSummaryTool when looking at combined muons, and the MuonTrackSummaryTool otherwise)

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading