Add option file for PbPb at sqrt(S)=5TeV for upgrade with interaction position at 0.
This option file sets for now interaction position with Pb beams to 0 in order to be able to use same DB tags as for upgrade pp productions.
This option file sets for now interaction position with Pb beams to 0 in order to be able to use same DB tags as for upgrade pp productions.