Isolation studies SL WG
Upgrade MC sample production with the channels listed in codimd with the 2024 conditions. This is for both charged and neutral isolation studies to be done before the next Run 3 data taking begins (March 2024)
This is request for 29M events. Following the guideline PPG approval is required :
- The maximum size of a request (per 2011-2012, 2015-2016, 2017-2018 data taking period, sum of MagUp and MagDown, per decfile) is: For an unfiltered request: 20M for full Run 1&2 data sets (split to years roughly by luminosity x cross-section) for DIGI * This corresponds to roughly 4M for Run 1 and ~5M for each Run 2 year.
The request require some fixes in DecFiles lhcb-datapkg/Gen/DecFiles#26 (comment 7282861)
Edited by Bogdan Kutsenko