Skip to content

signals for 2024 pH2+pp andSMOG2, with pp nu=5.7(~mu=4)

Qiuchan Lu requested to merge IFT_pH_pp into main

The goal of this MC request is for 2024 data-MC validation for pH2+pp, the simulation configuration is set to be similar as the real data-taking, see https://twiki.cern.ch/twiki/bin/viewauth/LHCbPhysics/SMOG2Runs2024#pH2_s_113_GeV.

In this MR, we need: Jpsi,Xc1,2,D0 in expected-2024-Q1.2 pH2+pp andSMOG2 with MagnetUp, with pp mu~4.

Since pileup-pp is not implemented in SMOG2 productions in LbMCSubmit(to be done), the stage6 is created:

  1. Starting from standard nu=7.6(pp):

    ppH_2024_MU_nu7.6.stage0.yaml

sim-version: 10
name: Jpsi_Xc_D0 nu7.6 
inform:
  - oscar.boente@cern.ch
  - kara.mattioli@cern.ch
  - emilie.amandine.maurice@cern.ch
WG: IFT
file-format: DIGI
generation:
    production-tool: Epos
samples:
  - event-types:
    - 22162000
    - 28142242
    - 28142252
    - 24142002
    data-types:
      - 2024.Q1.2
    num-events: 4_000_000
    collision-types:
      - ppH2
    magnet-polarities:
      - MagUp
    smog: True
    generation:
      options:
        Beam: andSMOG2
        SignalMode: embedding
  1. Change the pp Beamfile to Beam6800GeV-mu100-2024.Q1.2-nu5.7.py

    • By comparing pp.stage6.yaml generated w/o pileup-pp=5.7 in pp stage0.yaml, the only difference of changing the pile-up is the BookKeeping Condition and the pp Beamfile.
  2. We need new Simulation Condition:

    • ppH2-Beam6800GeV-2024.Q1.2-MagUp-andSMOG2-Nu5.7andNu0.087-Pythia8andEPOS
Edited by Qiuchan Lu

Merge request reports

Loading