Skip to content
Snippets Groups Projects

BuSca spring data-taking period upgrade

Merged Valerii Kholoimov requested to merge dev_kholoimov_busca_march_upgrade into master
  • Adding the same sign lines for MuMu, ElEl and PostScale lines, with the trigger turned off, only for monitoring purposes.
  • Updated BuSca selection NN by removing PT from input variables.
  • Added a helicity versus mass histogram for the region that was identified with the smallest amount of background during the 2024 data-taking period.

image.png

The target was put as a downstream update branch for now, should be changed after !1906 (merged) will be merged.

require lhcb-datapkg/ParamFiles!130 (merged) to be tested with

FYI: @adeoyang @jzhuo @vsvintoz @bjashal

Edited by Valerii Kholoimov

Merge request reports

Merge request pipeline #11673209 passed

Merge request pipeline passed for ef31d406

Approval is optional

Merged by Miroslav SaurMiroslav Saur 2 weeks ago (Apr 8, 2025 4:31am UTC)

Pipeline #11680780 passed

Pipeline passed for 46a26b63 on master

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading