2022 reprocessing
Options for the global reprocessing of 2022 data. Towards https://gitlab.cern.ch/lhcb/opg/-/issues/2
Goes with LHCb!4176 (merged)
The reprocessing will be run on the PASSTHROUGH stream of HLT2 and write FULL, TURBORAW, TURCAL and LUMI streams.
TODO:
-
Check what still needs to be merged before we can proceed - !2436 (merged)
- Got requests for !2356 (merged), !2374 (merged) and !2472 (merged)
-
Write MDF merger -
Figure out details of global tuning (tracking chi^2) -
Test production locally
Merge request reports
Activity
added 16 commits
-
e5ceb490...2e18e72c - 15 commits from branch
master
- a41ea1ea - first draft of options for 2022 reprocessing
-
e5ceb490...2e18e72c - 15 commits from branch
added RTA label
- Resolved by Marian Stahl
TURBO only keeps the ODIN bank
I think we should keep the raw event in Turbo as long as one cannot refit tracks offline.
added 1 commit
- 3afefe4f - first draft of options for 2022 reprocessing
- Resolved by Marian Stahl
- Resolved by Marian Stahl
added lhcb-head-2 label
- [2023-06-24 00:14] Validation started with lhcb-head-2#908
- [2023-06-25 00:12] Validation started with lhcb-head-2#909
- [2023-06-26 00:13] Validation started with lhcb-head-2#910
- [2023-06-27 00:11] Validation started with lhcb-head-2#911
- [2023-06-28 00:13] Validation started with lhcb-head-2#912
- [2023-06-29 00:13] Validation started with lhcb-head-2#913
- [2023-06-30 00:10] Automatic merge failed in [lhcb-head-2#914](https://lhcb-nightlies.web.cern.ch/nightly/lhcb-head-2/914/Moore/checkout
- [2023-07-01 00:13] Validation started with lhcb-head-2#915
- [2023-07-02 00:12] Validation started with lhcb-head-2#916
- [2023-07-03 00:12] Validation started with lhcb-head-2#917
- [2023-07-04 00:14] Validation started with lhcb-head-2#918
- [2023-07-05 00:14] Validation started with lhcb-head-2#919
- [2023-07-06 00:18] Validation started with lhcb-head-2#920
- [2023-07-07 00:16] Validation started with lhcb-head-2#921
- [2023-07-08 00:14] Validation started with lhcb-head-2#922
- [2023-07-09 00:13] Validation started with lhcb-head-2#923
- [2023-07-10 00:14] Validation started with lhcb-head-2#924
- [2023-07-11 00:14] Validation started with lhcb-head-2#925
- [2023-07-12 00:24] Validation started with lhcb-head-2#926
- [2023-07-13 00:13] Validation started with lhcb-head-2#927
- [2023-07-14 00:11] Validation started with lhcb-head-2#928
- [2023-07-15 09:21] Validation started with lhcb-head-2#929
- [2023-07-16 00:12] Validation started with lhcb-head-2#930
- [2023-07-17 00:13] Validation started with lhcb-head-2#931
- [2023-07-18 00:06] Validation started with lhcb-head-2#932
Edited by Software for LHCbadded 1 commit
- 496b0359 - first draft of options for 2022 reprocessing
added 41 commits
-
496b0359...8bb44295 - 40 commits from branch
master
- 5d33507f - options for 2022 reprocessing
-
496b0359...8bb44295 - 40 commits from branch
changed milestone to %RTA/2023.07.04
changed milestone to %RTA/2023.07.16
- Resolved by Marian Stahl
@samarian pointed out that the smog lines are missing in the configuration, as they were not available when we run HLT2 online. Can we please add them @mstahl ? They live in https://gitlab.cern.ch/lhcb/Moore/-/tree/master/Hlt/Hlt2Conf/python/Hlt2Conf/lines/ift
@samarian can you take care (in a separate MR) of including them also in https://gitlab.cern.ch/lhcb/Moore/-/blob/master/Hlt/Hlt2Conf/python/Hlt2Conf/settings/hlt2_pp_commissioning.py so we have them for this year?