Skip to content

HLT1 configuration for 2023 realistic MC

Christina Agapopoulou requested to merge 2023-hlt1-simulation into 2023-hlt1pp-patches

This MR:

  • includes an Allen-via-Moore configuration of 0x10001004 (without prescales)
  • Adds a beamline offset to match the beamline position to the generated one
  • Modifies the Allen lbexec test to run on 2023 realistic MC
  • Flagging is implemented by setting all the pre- and post-scales of HLT1 lines to 1 . (this implies the passthrough line being unprescaled and therefore all events pass, but a more robust logic could be implemented in the future).
  • SciFi v8 banks are decoded as v7, to reproduce a bug with the FT bank version in the June/July data-taking.

PV and long tracking efficiency was checked and found compatible with earlier expected 2023 MC results. Details and local test results can be found in https://codimd.web.cern.ch/ZhFJcSVeQTSmknla3eAC9A

To be tested with Allen!1455 (merged)

@rmatev

Edited by Christina Agapopoulou

Merge request reports

Loading