HLT1 configuration for 2023 realistic MC
This MR:
- includes an Allen-via-Moore configuration of 0x10001004 (without prescales)
- Adds a beamline offset to match the beamline position to the generated one
- Modifies the Allen lbexec test to run on 2023 realistic MC
- Flagging is implemented by setting all the pre- and post-scales of HLT1 lines to 1 . (this implies the passthrough line being unprescaled and therefore all events pass, but a more robust logic could be implemented in the future).
- SciFi v8 banks are decoded as v7, to reproduce a bug with the FT bank version in the June/July data-taking.
PV and long tracking efficiency was checked and found compatible with earlier expected 2023 MC results. Details and local test results can be found in https://codimd.web.cern.ch/ZhFJcSVeQTSmknla3eAC9A
To be tested with Allen!1455 (merged)
Edited by Christina Agapopoulou