Draft: Add HLT2 lines for Bd2Jpsi(mumu/ee)KS(pipi), Bd2Jpsi(mumu/ee)Kstar(Kpi) and Bu2Jpsi(mumu)Kplus in B2CC
Implementation of HLT2 lines for the following stripping lines used in the time-dependent CPV analysis to measure sin2beta with Bd2Jpsi(mumu/ee)KS(pipi) and Bd2psi(2S)(mumu)KS(pipi):
- Bd2Jpsi(mumu)KS(pipi) without B lifetime cut with LL, DD, LD and UL reconstructed KS (At the moment 2 different lines with slightly different requirements)
- Bd2psi(2S)(mumu)KS(pipi) without B lifetime cuts with LL and DD reconstructed KS
- Bd2Jpsi(ee)KS(pipi) with a detached line and a line without B lifetime cut both with LL and DD reconstructed KS
- Bd2Jpsi(mumu)Kstar(Kpi) with a detached line and a prompt line
- Bu2Jpsi(mumu)Kplus with a line without a B lifetime cut
The lines for Bd2Jpsi(ee)Kstar(Kpi) and Bu2Jpsi(ee)Kplus are need some more studies