Skip to content

Include muon cabling in L1DecoderCfg

Savanna Shaw requested to merge sshaw/athena:newjo-l1decoder into master

Moving the muon cabling configurations to the L1DecoderCfg since the muon RoI unpacking always needs the cabling to be configured. This should make it possible to run the newJO trigger test without enabling HLT muons.

cc @tbold for info.

Merge request reports