LRT configuration Updates
This change:
- Adjusts the electron LRT RoI size to match the development size.
- Enables the Seed Redundancy check for muon and electron LRT chains
- Retains track parameters for electron LRT
- Reduces the Doublet DR for fullscan from 270 -> 200
- Moves the min clusters cut into the new ConfigSettings.py file, transferring the control of this parameter from TrackingCuts
These changes result in a change to the reference counts for electronLRT chains.