Skip to content
Snippets Groups Projects

Campaigns: Add MC23aNoPileUp, MC23dNoPileUp, MC23eNoPileUp configurations

Merged John Derek Chapman requested to merge jchapman/athena:NoPileUpCampaigns_24.0 into 24.0

Previously the only Campaign configuration option for MC23 jobs running digitization without pile-up was to use the Campaigns.MC23NoPileUp preInclude function. This sets flags.Input.ConditionsRunNumber to be 410000, so jobs for sub-campaigns other than MC23a require the use of --DataRunNumber on the command-line to fix this.

This merge request adds Campaigns.MC23aNoPileUp, Campaigns.MC23dNoPileUp, Campaigns.MC23eNoPileUp preInclude functions which correctly set flags.Input.ConditionsRunNumber for each sub-campaign.

Tagging @ewelina, @tlari, @mbandier, @schaarsc, @tadej

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
Please register or sign in to reply
Loading