Draft: Main eycalib reccommendation es2024 run3 v0
This is a very preliminary draft MR for 2022-2024 ey calibration recommendation, but we would like to use this to address several checkpoints before we release:
-
Rebase main and update the root file path for PS, E1E2, and gain as they are already on cvmfs -
New accordion scale in egammaLayerRecalibTool -
New in-situ scale and resolution -
AF3 correction and systematic for MC23 -
Additional TileGap3 systematic for extended eta from 1.6 to 1.72 in Run3 -
New SCALE NPs on E1E2, E0 and L2Gain for run2->run3 extrapolation -
Photon conversion systematic -
Update pileup noise systematic with run3 pileup value -
Fine-tuning of consistency of systematic model
The MR is aimed to be ready near the end of February 2025.
Edited by Linghua Guo