Repair strategies
Dealing with various repair strategies might require a new column.
Currently we are considering three approaches:
- Additional column in the Failure Modes sheet - to define whether repair should be finished upon transition to other phase (greater flexibility, but at the cost of increasing the size of the input file).
- Additional column in the Simulation file - to set global repair strategy (e.g., "cancel on phase change", etc.)
- Parametrisation of the existing column
HELD_UNTIL_REPAIR
Also, take a look into: #27