Skip to content
Snippets Groups Projects
  • Released date
  • Created date

Evidence collection

Collected 1 year ago

Release notes

This release adds a tab in the GUI to display old test results. See reporting!89 for more details. Instructions about how to use it is also document in the powerboard reception test guide slides: https://docs.google.com/presentation/d/1-WVlZ4b4PptSjBrUzVuSk3zCSu9teVL90o5rD57MDbU/edit?usp=sharing

Evidence collection

Collected 1 year ago

Release notes

  • Add a panel stage transition button in GUI
  • Fix in test upload script wrt the old test result issue
  • ITk DB login now never expires
  • Lots of database registration updates (not relevant to the web GUI)
  • "Thermal Cycle" tab included. This is used for LBNL QC only, not relevant for the reception test.

Evidence collection

Collected 2 years ago

Release notes

  • Add support for CPX200DP power supply

Evidence collection

Collected 2 years ago

Release notes

Main updates:

  • Add support for CPX400DP power supply
  • Minor improvements for massive QC tests (speed up, adjust thresholds for cold tests, add burn-in, etc.)

Evidence collection

Collected 2 years ago

Release notes

This release updates some of the cut thresholds for powerboard tests, including DCDC on voltage, NTCPB, CTAT, Shuntx, and Shunty. All those cuts become looser than previous cuts in order to match the changes in PPB powerboards.

After updating to this release, users doing reception test should see all green cells in the test GUI for a good powerboard.

Evidence collection

Collected 2 years ago

Release notes

Main updates of this release are:

  • Speed up testing: now it takes about 2 minutes to test 1 PB (20 minutes for a panel) for BASIC FUNCTIONALITY TEST, and about 20 minutes/PB for CHARACTERIZATION TEST (not needed for reception test)
  • Fix a bug in reading AMAC eFuse ID for AMACstar
  • Fix a bug in optimizing the idcdcP/N register settings for input current monitoring for AMACstar

If you are updating from firmware older than v0.2.22, make sure you set the institution code following the release note of v0.2.22 (https://gitlab.cern.ch/berkeleylab/pbv3_test_adapter/firmware/-/tags/v0.2.22) - you don't need to do this if you have already done so in v0.2.22.

Evidence collection

Collected 2 years ago

Release notes

Main updates of this release are:

  • AMACstar support.
  • Database upload via GUI.
  • Setting of institution to store in test results.

After updating to this firmware, the first thing users need to do is to set the institution code in the GUI (see also latest guide slide):

Screen_Shot_2022-03-28_at_11.06.15

To use the test result upload button, follow this instruction (see also latest guide slide):

Screen_Shot_2022-03-28_at_11.06.36

Screen_Shot_2022-03-28_at_11.06.42

Evidence collection

Collected 3 years ago

Release notes

  • Support for ten Powerboards
  • Improved stability of Endeavour via deglitching
  • Add tools to PetaLinux

Evidence collection

Collected 4 years ago

Release notes

PetaLinux

PowerGUI

  • Update reporting package to 1.4
  • Update powertools package to 1.4
  • Update reception-setup package to 1.4

Packages

  • Add httptime package (version 0.2.0)
  • Update python-itkdb to 0.3.6

Evidence collection

Collected 4 years ago

Release notes

PetaLinux

PowerGUI

  • Update recipes to actually use the release tag
  • Update reporting package to 1.3
  • Update powertools package to 1.3
  • Update reception-setup package to 1.3