Skip to content
Snippets Groups Projects
Forked from atlas / athena
Source project has a limited visibility.
  • Savanna Shaw's avatar
    efcb5967
    Adding muComb to trigger new JO test · efcb5967
    Savanna Shaw authored and Adam Edward Barton's avatar Adam Edward Barton committed
    Adding the L2 combined muon step to the trigger new JO test (ATR-20242). The step runs:
    - A view data verifier to pick up the L2 SA muons from the previous step
    - The ID fast track finding
    - the muComb algorithm
    
    Currently it seems that the combined electron+muon chains need to have the same number of steps for electrons and muons, so I split the muon chains into two type. The default chains (used in combination with other signatures) run the L2 SA and combined steps, and the msonly chains run the L2 SA and precision SA steps (and the L2 combined and preicion SA steps are only created for the relevant chains).
    efcb5967
    History
    Adding muComb to trigger new JO test
    Savanna Shaw authored and Adam Edward Barton's avatar Adam Edward Barton committed
    Adding the L2 combined muon step to the trigger new JO test (ATR-20242). The step runs:
    - A view data verifier to pick up the L2 SA muons from the previous step
    - The ID fast track finding
    - the muComb algorithm
    
    Currently it seems that the combined electron+muon chains need to have the same number of steps for electrons and muons, so I split the muon chains into two type. The default chains (used in combination with other signatures) run the L2 SA and combined steps, and the msonly chains run the L2 SA and precision SA steps (and the L2 combined and preicion SA steps are only created for the relevant chains).
Code owners
Assign users and groups as approvers for specific file changes. Learn more.