2024 BuSca Tupling (MagDown)
Tuple 2024 BuSca data with S24c4 (MagDown)
Hlt2QEE_DownstreamBuScaInclusive2H_DD
is the line we added for the end-of-2024 data-taking with HLT1 downstream tracking, in order to study the background distribution and to prepare the better HLT1/2 lines for 2025 data-taking within BuSca project.
The HLT2 is actually an inclusive line, to be able to analyze the result the Mass hypothesis substitution is needed and in this tuple we tuple the following possible end-states:
- di-pion
- di-kaon
- di-muon
- di-electron
This AP only include the part of data that corresponds to MagDown polarity, we will first check this part of the data and wait the MagUp to be available in BKK then create a new AP for it.
Edited by Jiahui Zhuo