B2OC Lb2LcPi Run 3: run on expected 2024 min bias MC with some adaptations in hlt2.py
Analysis Production for the Run 3 Commissioning 2023
B2OC Run 3 2024 min bias MC Analysis Production
Hlt2 stripping line:
Hlt2B2OC_LbToLcpPi_LcpToPKPi targetting the decay: Lb -> Lc(->pKpi) pi
decay of interest:
Lb -> Lc(->pKpi) pi
Similar to !681 (merged)
Edited by Maciej Artur Giza