Expected 2024 conditions for HLT development
Need MC productions using "expected 2024 conditions", in order to develop HLT reconstruction and lines:
- Luminosity: pp collisions nu = 7.6 (L=2x10^33), 25ns spillover
- Beam energy: 6800 GeV
Similar detector conditions to 2023 productions, with UT included and Velo fully closed (nominal position).
Beam parameters should be provided by the luminosity group (based on 2022 conditions + what is expected for nominal operation in Run 3)
Edited by Carla Marin Benito