Skip to content

Signals in pAr,pHe,ppAr,ppHe in 2024.Q1.2

Qiuchan Lu requested to merge IFT_psi_pAr24 into main

MC requests for signals in pAr,pHe,ppAr,ppHe in 2024.Q1.2. https://its.cern.ch/jira/browse/LHCBGAUSS-2933

Signals:

  • 24142001: incl_Jpsi,mm=DecProdCut (prompt)
  • 28142242: chic1_Jpsigamma,mumu=TightCut,LooserCuts
  • 22162000: D0_Kpi=DecProdCut
  • 28112001: psi2S,mm=DecProdCut (prompt)

Data taking period

  • Magnet Up pAr, ppAr in 2024.Q1.2
  • Magnet Up pHe, ppHe in 2024.Q1.2

Priority

  • pHe, ppHe priority: 1b
  • pAr, ppAr priority: 1b

NumberOfEvent

  • 4M each cases
Edited by Qiuchan Lu

Merge request reports

Loading