Packages list was needed for SVN, no longer necessary with Git
Cherry picked from !178 (merged) on master
GitLab Runners cleaning campaign ongoing (ETA 2nd October 2023). Check https://cern.ch/otg0078219 for further information.
Packages list was needed for SVN, no longer necessary with Git
Cherry picked from !178 (merged) on master