Validation of FT: DetDesc vs. DD4hep
@zexu @lohenry @tlatham @gcorti @ldufour
The first LHCbPR tests for FT are ready. The activation of the tests takes place in !872 (merged).
How to see the results?
- Go to https://lblhcbpr.cern.ch/gauss/validan
- On the left choose:
PRTEST-FG-UpgradeBaseline
- On the right choose 2 jobs with the platform:
x86_64_v2-centos7-gcc11-opt
andx86_64_v2-centos7-gcc11+dd4hep-opt
Below you will find a quick summary.
Test no. 1
checked on: 22/08/22
Options
- 200 events
- Pythia8 (shared between threads)
- 8 Gaudi threads, 8 Geant4 worker threads
- upgrade beam configuration
- the magnet is still off!!
Example plot from LHCbPR (DD4hep left vs. DetDesc right)
G4 Visualization
With @fbilandz we prepared the visualization of what Geant4 sees in DetDesc and DD4hep when using only FT
. I can already see 2 things to be discussed:
- in DetDesc NeutronShielding is added together with FT, which is not the same for dd4hep
- there is no beamhole in dd4hep?