Skip to content

Optmized Bd0ToPPbarhh

Youhua Yang requested to merge optimized_Bd0ToPPbarhh into bnoc_run3_zewen

Now I have modified new requirement and merge three lines into one inclusive line

  1. change the minimum PT of each h from 300 MeV to 500 MeV
  2. remove PID requirement on each h
  3. change PID requirement of proton from -5 to 0
  4. Change MINIPCHI2 from 9 to 4
  5. remove ghost and track chisquare cut

The efficiency change from 0.024 to 0.436% Now inclusive is 0.2 kHz

Edited by Zewen Chen

Merge request reports

Loading