Skip to content
Snippets Groups Projects

BandQ tcc exclusive line

Merged Ning Qin requested to merge bandq_spruc_tcc into bandq_EoY_sprucing

This mr is for bandq tcc exclusive line.

Tcc -> D0 D0 pi+

The D0 meson selection are copied from Moore/Hlt/Hlt2Conf/python/Hlt2Conf/lines/charm/d0_to_hh.py with selections loosened. For now, only D0 -> K pi is added.

The bachelor pi+ has no specific selections added.

Problem(Solved):

The offline compile of moore is passed. But with the a modified test script /Moore/Hlt/Hlt2Conf/options/examples/b_to_open_charm/spruce_b2oc_example.py, the output of this line is empty. The log file of the script is also added and will be removed later.

ToDo:

  • Remove the test scripts
  • Remove the log file
  • Add D0 -> hhhh + D0 -> hhhh
  • Add D0 -> hh + D0 -> hhhh
  • Merge two tcc_exclusive file into one
Edited by Ning Qin

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
  • Ning Qin added 2 commits

    added 2 commits

    • 864dccda - Remove the hlt2 trigger line. Remove the log.
    • d76bb4b1 - Merge two files into one. Add tcc d0tohhhh.

    Compare with previous version

  • Ning Qin marked the checklist item Remove the log file as completed

    marked the checklist item Remove the log file as completed

  • Ning Qin marked the checklist item Add D0 -> hhhh + D0 -> hhhh as completed

    marked the checklist item Add D0 -> hhhh + D0 -> hhhh as completed

  • Ning Qin marked the checklist item Add D0 -> hh + D0 -> hhhh as completed

    marked the checklist item Add D0 -> hh + D0 -> hhhh as completed

  • Ning Qin marked the checklist item Merge two tcc_exclusive file into one as completed

    marked the checklist item Merge two tcc_exclusive file into one as completed

  • Ning Qin resolved all threads

    resolved all threads

  • Ning Qin changed the description

    changed the description

  • Ning Qin marked this merge request as ready

    marked this merge request as ready

  • Ning Qin changed title from Draft: The tcc_exclusive line. Compile ok but no output. to BandQ tcc exclusive line

    changed title from Draft: The tcc_exclusive line. Compile ok but no output. to BandQ tcc exclusive line

  • Author Developer

    Test with this scipt and evt_max=100,000. The output of the new lines

    LAZY_AND: SpruceBandQ_tcc_d0tohhDecisionWithOutput           #=60032   Sum=30
    LAZY_AND: SpruceBandQ_tcc_d0tohh_d0tohhhhDecisionWithOutput  #=60032   Sum=30
    LAZY_AND: SpruceBandQ_tcc_d0tohhhhDecisionWithOutput         #=60032   Sum=36

    The delta size of the ouput dst is 2.56 MB, bandwidth cost estimation

    2.56 MB*45.1 kHz/ 100000 = 1.15 MB/s

    It would be appreciated if you could make a check whether these are within the limit.@yajing

    Edited by Ning Qin
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Loading
  • Please register or sign in to reply
    Loading