B2CC Implements of lines
This is MR for implements of B2CC lines and will be target to B2CC summary MR !4287 (merged)
-
New cuts available on vtx_max_chi2tot and massconstrain
-
Tighten the mass window of all
Bd,sToJpsiXlines to 5080-5620 MeV,Bd,sToJpsieeXlines have largercomb_m3600-6000 MeV -
Removed the
delta_masscuts in lines and usemassconstrains=["J/psi(1S)"]instead -
Remove all the
diracuts -
Set default
PID_mu=-3for basic buildermake_selected_jpsi2mumu -
Cut on JpsieePhiandJpsieeKstarline -
Add
comb_mandvtx_mwindow ande_IPCHI2>9 -
Hlt2B2CC_BuToJpsiKplus_JpsiToMuMu_Detached- cuts in the talk by Constantinos Vrahas et al. -
Add
comb_mwindow,IPCHI2andmu_PIDcut for the Jpsi -
Hlt2B2CC_BdToJpsiKstar_JpsiToMuMu_Detachedcuts in the talk by David Bacher. -
Add
PIDcut for the muon -
Hlt2B2CC_BsToJpsiPhi_Detached- optimization should be provided by phi_s team. -
Hlt2B2CC_BsToJpsiPhi_ExtraMuon- optimization should be provided by phi_s team, is pre-scaling possible? -
Added
IPCHI2cut on muon -
Hlt2B2CC_BsToJpsiKstar- any possible improvement by Jie Wu @jiew ? -
Hlt2B2CC_LbToJpsipH&Hlt2B2CC_BsToJpsif0&Hlt2B2CC_BsToJpsif0Kaon&Hlt2B2CC_BsToJpsif0ws- any possible improvement by Zhihong Shen @zhshen ? e.g., propose whether pre-scaling possible for theHlt2B2CC_BsToJpsif0ws -
Hlt2B2CC_BdToJpsiKshort_JpsiToEE*&Hlt2B2CC_BuToJpsiKplus_JpsiToEE_*optimization with proposed cuts by Vukan -
Hlt2B2CC_BdToJpsiKstar_JpsiToPPoptimization should be provide by Juan Leite (changed in !4315 (merged))
Output from BW test in local after rebase the MR on !4287 (merged) :

