Skip to content

Merge Z->ee line for Run-3

Hang Yin requested to merge dielec_run3 into qee_upgrade

@wbarter @rjhunter The first version of Z-> ee line is ready, please have a look on it. For this line, both electrons are required to pass PT > 15 GeV, TrkChiDof < 4 requirements, and the mass of di-electron should be > 40 GeV. This line already passed format check, but failed for python-liniting check, due to Di-B jet line. So it should be OK to merge the line into qee_upgrade branch.
The tested trigger rates are (with 10k evts)

Line:    Hlt2LowPtSingleJetLineDecision                  Incl: 0.8  +/- 0.28 kHz, Excl: 0.8  +/- 0.28 kHz
Line:    Hlt2MuMuSSLineDecision                          Incl: 0.0  +/- 0.0  kHz, Excl: 0.0  +/- 0.0  kHz
Line:    Hlt2SingleHighPtMuonIsoLineDecision             Incl: 0.0  +/- 0.0  kHz, Excl: 0.0  +/- 0.0  kHz
Line:    Hlt2SingleHighPtMuonLineDecision                Incl: 0.1  +/- 0.09 kHz, Excl: 0.1  +/- 0.09 kHz
Line:    Hlt2SingleHighPtMuonPrescaleLineDecision        Incl: 0.0  +/- 0.0  kHz, Excl: 0.0  +/- 0.0  kHz
Line:    Hlt2ZToEELineDecision                           Incl: 0.1  +/- 0.09 kHz, Excl: 0.1  +/- 0.09 kHz
Line:    Hlt2ZToEESSLineDecision                         Incl: 0.2  +/- 0.14 kHz, Excl: 0.2  +/- 0.14 kHz
Line:    Hlt2ZToMuMuLineDecision                         Incl: 0.0  +/- 0.0  kHz, Excl: 0.0  +/- 0.0  kHz
Edited by Ross John Hunter

Merge request reports

Loading