Skip to content

Full Hlt2 config for data-taking

Marian Stahl requested to merge mstahl_hlt2data into master

Depends on Moore!1961 (merged)

Hlt2 configuration for pp collision data-taking. Includes the following streams

name routing bit contents
FULL 87 Topo, inclusive detached dileptons
TURBO 88 lines from physics WGs
TURCAL 90 PID, monitoring, commissioning and tracking efficiency lines
NOBIAS 91 prescaled (0.1) passthrough of Hlt1ODINNoBiasDecision
PASSTHROUGH 92 passthrough of Hlt1 physics lines

All streams include the lumi line (Hlt2Lumi). The lumi routing bit is 94, and the physics RB is 95 (set for all streams in the table).

Edited by Marian Stahl

Merge request reports

Loading