Skip to content
Snippets Groups Projects
Select Git revision
  • ALiBaVaEventLoader
  • Timepix3_improved_calibration
  • better_decoding
  • dsipm_tb
  • editMBI
  • eventloaderOsci
  • f/timealign
  • f/uncertainties
  • fp_heidelberg
  • gvignola/Fe55APTS
  • master default protected
  • module_eCT_sequential
  • p-jobsub
  • parallel
  • v1.0-stable
  • v2.0-stable
  • v2.0.1
  • v2.0
  • fp_heidelberg_v1.0
  • v1.0.3
  • v1.0.2
  • v1.0.1
  • v1.0
  • v0.9.18
  • v0.9.17
  • v0.9.16
  • v0.9.15
  • v0.9.14
  • v0.9.13
  • v0.9.12
  • v0.9.11
  • v0.9.10
  • v0.9.9
  • v0.9.8
  • v0.9.7
  • v0.9.6
36 results
You can move around the graph by using the arrow keys.
Created with Raphaël 2.2.023Apr22212017161514987632131Mar30272625242019181716151312111096525Feb212019181714131210523Jan222017151413111087Introduce new parameter `quantile` for a user selection of the quantiles to evaluate for material budget imagesFirst draft of READMEToo many changes done at once :-/ Re-work module quite a bitget rid of copy constructordebuggingEventLoaderTimepix3: shift int histograms by -1/2 binEventLoaderMupixTelescope: shift int histograms by -1/2 binEventLoaderEUDAQ2: shift int histograms by -1/2 binEventLoaderCLICpix2: shift int histograms by -1/2 binEventLoaderCLICpix: shift int histograms by -1/2 binEventLoaderATLASpix: shift int histograms by -1/2 binDUTAssociation: shift hNoAssocCls by -1/2 binCorrelations: shift correlationTimeInt by -1/2 binClusteringSpatial: shift int histograms by -1/2 binClustering4D: shift int histograms by -1/2 binAnalysisTimingATLASpix: shift int histograms by -1/2 binAnalysisEfficiency: shift int histograms by 1/2 bin + set axis title etc. in short-hand notationAnalysisDUT: shift clusterWidthRowAssoc and clusterWidthColAssoc -1/2 binAnalysisDUT: shift hPixelRawValues and clusterSizeAssociated by -1/2 binTrackingSpatial: shift clustersPerTrack and tracksPerEvent by -1/2 binTrackingSpatial: increase bining of trackChi2 from 1 to 0.5 and trackChi2ndof from 0.5 to 0.1Tracking4D: shift clustersPerTrack and tracksPerEvent by -1/2 binTracking4D: increase bining of trackChi2 from 1 to 0.5Tracking4D: increase bining of trackChi2ndof from 0.5 to 0.1Merge branch 'fix_pixel_multiplicity' into 'master'EventLoaderEUDAQ2: fill pixelMultiplicityPerCorry in correct lineEventLoaderEUDAQ2: rename pixelMultiplicity into pixelMultiplicityPerEudaqEvent + correct title (corry -> eudaq) + add pixelMultiplicityPerCorry eventPush TrackingMultiplet from WIP to FunctionalMerge branch 'testing_structure' into 'master'git: ignore testing outputCI: split testing into categoriesTesting: adjust dependencyTesting: rename testsMerge branch 'tracking4d_perf' into 'master'Tracking4D: fix formattingTests: update after fixing bug in time cut matching of Tracking4DTracking4D: minor fixesTracking4D: don't resort to string comparisons if we can simply use the shared_ptrTracking4D: add @pschutze as author/maintainerTracking4D: fix bug in matching of timing cuts, improve performance by x2
Loading