2025A master time
The first task in reconstruction is to determine the proper stability of master time. Later, this can be used to determine timing for sub-detectors.
For reference, in 2024, the related issues are:
Runs
- 12383-12416: first ECAL scan (central cell(2,3) run 12383)
- 12427: first production run
- 12510: last run before adjusting timing
- 12514: first run after adjusting timing
- 12586: last run before connecting only ECAL central cell to sum card
- 12587: first run after connecting only ECAL central cell to sum card
- 12592-12621: second ECAL scan (central cell(2,3) run 12592)
- 12664: last run at nominal intensity
- 12665: first run at high intensity
- 12777: last run at high intensity
- 12778: back at nominal intensity
- 12813: last run before LYSO in PoleZero suppression card
- 12814: first run after LYSO in PoleZero suppression card
- 13498: last production run
IMPORTANT: after June 13th, many DAQ error started. @poliakov marked them as bad (see https://twiki.cern.ch/twiki/pub/P348/RunsInfo2025/list_runs_April_July_2025_0.pdf, the last period ends on June 13th - last run of that day is 13220
Edited by Andrea Celentano