Skip to content
Snippets Groups Projects
Commit 4283a374 authored by Laurent Petre's avatar Laurent Petre
Browse files

Merge branch 'feature-low-thr-update' into 'main'

Update instructions for low thr miniDAQ run

Closes #4 and #3

See merge request !33
parents 600ec5a7 4b954833
No related branches found
No related tags found
1 merge request!33Update instructions for low thr miniDAQ run
Pipeline #7195739 passed
...@@ -90,8 +90,8 @@ A scan will be DONE when all 13 AMC Slots show DONE (6 for GE+1/1 and GE-1/1 and ...@@ -90,8 +90,8 @@ A scan will be DONE when all 13 AMC Slots show DONE (6 for GE+1/1 and GE-1/1 and
## Analyze the Calibration Pulse Scan ## Analyze the Calibration Pulse Scan
(to be done in /gemdata directory) (to be done in /gemdata directory)
ssh gemvm-control
sudo -u gemdoc -i sudo -u gemdoc -i
ssh gemvm-control
gem-find-dead-channel -r <RUNNUMBER> gem-find-dead-channel -r <RUNNUMBER>
After above is complete, open [Grafana : Dead Channels Trends](https://cmsgemonline-monitoring.app.cern.ch/d/Trh6MZd4k/dead-channels-trends?orgId=1&from=now-7d&to=now) and refresh page. Look through and see if any SC had a spike in # of dead channels. (Can also check the nice overview at the top of the page before scrolling through all SC). After above is complete, open [Grafana : Dead Channels Trends](https://cmsgemonline-monitoring.app.cern.ch/d/Trh6MZd4k/dead-channels-trends?orgId=1&from=now-7d&to=now) and refresh page. Look through and see if any SC had a spike in # of dead channels. (Can also check the nice overview at the top of the page before scrolling through all SC).
......
...@@ -78,7 +78,8 @@ In case the calibration suite page was already opened before, reload the page ma ...@@ -78,7 +78,8 @@ In case the calibration suite page was already opened before, reload the page ma
In case the URL was changed, open the status table by the appropriate button and open the GEM calibration interface from the list of running applications. In case the URL was changed, open the status table by the appropriate button and open the GEM calibration interface from the list of running applications.
Select the "Physics" option in the drop down window. Select the "Physics" option in the drop down window.
The option to use a given threshold for all VFATs instead of the one from the VFAT configuration can be chosen (`Same for all VFAT`) and the threshold can be set.
The option to use a given threshold for all VFATs instead of the one from the VFAT configuration can be chosen (`Same for all VFAT`) and the threshold can be set. Moreover, it can be decided not to mask the noisy channels by selecting the `None` option in `Apply Channel Mask`).
Click on the "Apply settings" button. Click on the "Apply settings" button.
**Return to RCMS and enable the transfer to Tier-0 (T0) in the drop down window below the "DAQ" sub-system column, if the data are intended to be saved to disk. **Return to RCMS and enable the transfer to Tier-0 (T0) in the drop down window below the "DAQ" sub-system column, if the data are intended to be saved to disk.
...@@ -88,6 +89,8 @@ From the RMCS interface, press on "Configure" and "Start". ...@@ -88,6 +89,8 @@ From the RMCS interface, press on "Configure" and "Start".
Once the statistics will be satisfactory, the run should be stopped with the "Stop" button. Once the statistics will be satisfactory, the run should be stopped with the "Stop" button.
Then the MiniDAQ instance can be destroyed with the "Destroy" button in the _Automator_ control bar. Then the MiniDAQ instance can be destroyed with the "Destroy" button in the _Automator_ control bar.
For MiniDAQ runs a [DQM instance](http://dqmfu-c2b03-46-01.cms:8100/dqm/gem-online/) is available, where the runs taken can be checked.
## Taking a CSC-EMTF-GEM join run on the integration setup in building 904 ## Taking a CSC-EMTF-GEM join run on the integration setup in building 904
This paragraph covers the required actions on the GEM side in order to be able to take cosmic data on the GE1/1 integration setup using as triggers the signals from the ME1/1 chamber, available in the setup. This paragraph covers the required actions on the GEM side in order to be able to take cosmic data on the GE1/1 integration setup using as triggers the signals from the ME1/1 chamber, available in the setup.
......
...@@ -3,7 +3,7 @@ ...@@ -3,7 +3,7 @@
## Useful pages at p5 ## Useful pages at p5
* [GEM RCMS instance](http://cmsrc-gem.cms:20000/rcms/) * [GEM RCMS instance](http://cmsrc-gem.cms:20000/rcms/)
* [GEM MiniDAQ online DQM](http://fu-c2f11-23-03.cms:8070/dqm/online-dev) * [GEM MiniDAQ online DQM](http://dqmfu-c2b03-46-01.cms:8100/dqm/gem-online/)
### Control applications ### Control applications
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment