Skip to content
Snippets Groups Projects

AP for Lb2LcPPbarPi MC (2015)

Merged Zan Ren requested to merge rzan/my-analysis into master
1 unresolved thread

This is the AP request for Lb -> Lc p pbar pi simulated samples in 2015. In the previous AP request, the MC production for 2015 hasn't finished yet, such that the AP was not required at that time.

Edited by Zan Ren

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading