Skip to content
Snippets Groups Projects

Draft: Validation of IFT end of year re-sprucing

Closed Kara Mattioli requested to merge kmattiol/ift-EoYspruce-validation into master
1 unresolved thread

Validation test to check the IFT lines in the 2024 end of year re-sprucing campaign (https://gitlab.cern.ch/lhcb-dpa/project/-/issues/341#note_8753085).

Testing/checks will be done through the AP CI, i.e. this AP will not actually be merged and produced

Items/lines to check:

  • Isolated photon sprucing lines -> present in the re-spruced data (only for MagnetDown because the MagnetUp test file corresponds to a run before the HLT2 isolated photon lines were merged). The pT spectra correspond to the respective pT cuts in the lines, as expected.
  • Persistency of photon (in Ds line) and proton containers (in charm lines) - this is working. The containers are persisted and we can reconstruct Ds*+ candidates from the Ds+ line (using Ds+ and persisted photon container) and Lc candidates from the D0 line (using persisted pions, kaons and proton containers)
  • MB re-sprucing is fine
  • Standard channels (J/psi, D0, Lambda etc.) look good - this is just a sanity check as these lines were not modified for the re-sprucing

FYI @thboettc @samarian @oboenteg

Edited by Kara Mattioli

Merge request reports

Pipeline #9577832 passed

Pipeline passed for 8a78462a on kmattiol/ift-EoYspruce-validation

Closed by Ryunosuke O'NeilRyunosuke O'Neil 15 hours ago (Mar 13, 2025 6:31pm UTC)

Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading