Measure ratio of B->J/psiK and B->Dpi in 2024 data: Post May data
Measure ratio of B->J/psiK and B->Dpi in 2024 data
These channels have the best known BFs. Same as !1307 (merged) and !1436 (merged) but now with sprucing 24c2
Output
Produces 2 nTuples
- B->J/psiK from b2cc
- B->Dpi from b2oc
Merge request reports
Activity
added BandQ label
assigned to @pkoppenb
Welcome to Analysis Productions!This is a summary of the productions requested in this merge request:
Step Production ID Num Test LFNs Run time Estimated Output Size (MB) 2024_B2CC_Up 230288 1 0:10:58.719232 0.1 2024_B2OC_Up 230289 1 0:14:22.331397 0.3 2024_B2CC_Down 230290 1 0:13:20.407632 0.1 2024_B2OC_Down 230291 1 0:13:40.436345 0.5 Edited by LHCb Data Processing and Analysis
added datarun3 label
I get a pipeline error
Job failed in step 1 Ran for 124491 events in dirac:1077968597 Input file LFN:/lhcb/LHCb/Collision24/B2OC.DST/00231024/0013/00231024_00139050_1.b2oc.dst is in status part. This likely means you have set evt max somewhere.
However, Dirac says that /lhcb/LHCb/Collision24/B2OC.DST/00231024/0013/00231024_00139050_1.b2oc.dst has 124491 events.
Same for the three other tests.
requested review from @jianqiao
requested review from @yuhaow
I can see that there is a problem with the summaryXML which lists one of the files as only partially processed, I can't immediately figure out why as this is an DaVinci/application detail and the application log doesn't provide any info about why this is. Perhaps try one minor version previous to see if this is a recent bug?