Skip to content

WIP: test potential loose configuration, not for merging

Vava Gligorov requested to merge test_newlooseconfig into master

Opening this MR simply to trigger the CI and automated throughput tests, this should not be merged.

The goal is to compare the throughput against !238 (merged) and !249 (closed)

On top of !249 (closed) this opens the VeloUT search criteria to look for any tracks with P > 3 GeV, down to 0 PT. The number of candidates considered by CompassUT is increased to 16 to compensate and prevent loss of efficiency. The main physics gains on top of !249 (closed) are expected for kaon physics.

Merge request reports