BnoC: HLT2 / Spruce lines: 2-/3-/4-/5-body baryonic modes
Collection of new BnoC baryonic lines, currently still work in progress.
Implemented new modules (based on the final state):
- bbaryon_to_phh
- bbaryon_to_phhh
- bbaryon_to_l0hhh
- bbaryon_to_lightbaryon_hh
- bbaryon_to_hyperon_4h
Done:
- evaluate and tune basic builders, per specific selection or per decay topology - general cuts looks suitable for all modes at this moment
- finish various missing lines - all planned modules implemented
- crosscheck overlap with already existing modules -
bbaryon_to_lightbaryon_h
rewritten, some modules / decay topologies could be further reorganised - evaluate full rates - resulting rates listed on the bottom of the description
Future plans (outside of the scope of this MR)
- crosscheck with the topo lines - on hold until (mostly) final topo tuning for 2023 and later for 2024+
- based on previous step look on simple MVA-preselection per decay topology - more a long term work for a few months, first steps already ongoing
Resulting rates:
- rates were obtained using
upgrade_minbias_hlt1_filtered
sample, thus all the values should represent an upper limit of possible rates - only lines with non-zero rates are listed (using 2023 reconstruction sequence):
HLT2 line | Rate [Hz] |
---|---|
Hlt2BnoC_Lb0ToPpPimPipPim_NoPID | 402 |
Hlt2BnoC_Lb0ToPpPpPmKm | 67 |
Hlt2BnoC_Lb0ToPpPpPmPim | 67 |
Hlt2BnoC_XibmToPpKS0KmPim_LL | 67 |
Hlt2BnoC_XibmToPpKS0KmKm_LL | 67 |
Hlt2BnoC_XibmToPpKS0KmPim_DD | 67 |
Hlt2BnoC_XibmToPpKmKm | 67 |
Hlt2BnoC_XibmToPpKmPim | 201 |
Hlt2BnoC_XibmToPpPimPim | 201 |
TOTAL HLT2 Turbo stream | 1340 |
Sprucing line | Rate [Hz] |
---|---|
SpruceBnoC_Lb0ToPpKmPipPim | 134 |
SpruceBnoC_Lb0ToPpKpKmKm | 67 |
SpruceBnoC_Lb0ToPpKpPimPim | 67 |
SpruceBnoC_Lb0ToPpPimPipPim | 67 |
TOTAL Sprucing | 335 |
FYI: @amerli @tlatham @wbqian @zhangy @ziyiw
https://gitlab.cern.ch/lhcb-dpa/project/-/issues/243 https://gitlab.cern.ch/lhcb-dpa/project/-/issues/78
Edited by Eduardo Rodrigues