RD: add BTohhGamma_GammaToEELL lines
- HLT2 lines to select B->(Kpi,KK,pipi,pK)gamma for LL converted gamma + corresponding sprucing lines to run on output of Hlt2RD_BToHHGamma_GammaToEE once it is optimised
- Adding brem to gamma_to_ee builder and tightening selections
Rates and efficiencies
Assuming input rate = 1.14MHz
MB input sample = 100K expected_2024_min_bias_hlt1_filtered
HLT2 Trubo lines (added lines)
Line | Rate / Hz | Signal efficiency / % |
---|---|---|
BdToKpPimGamma_GammaToEELL | 23+/-16 | 0.3+/-0.1 |
BdToPipPimGamma_GammaToEELL | 34+/-20 | 0.24+/-0.05 |
BsToKpKmGamma_GammaToEELL | 34+/-20 | 0.27+/-0.05 |
LbToPpKmGamma_GammaToEELL | 11+/-11 | 0.25+/-0.05 |
HLT2 inclusive full-stream lines (modified builders)
Line | Old Rate / kHz | New Rate / kHz |
---|---|---|
Hlt2RD_BToHHGamma_GammaToEE_InclDecision | 0.89 +/- 0.1 | 0.25 +/- 0.05 |
Hlt2RD_BToHHHGamma_GammaToEE_InclDecision | 0.62 +/- 0.08 | 0.18 +/- 0.05 |
Sprucing lines (added lines)
Rates not tested but very low rates expected: 100 Hz in case of full overlap between the new sprucing lines selection and the inclusive ones they sit on top of. Overlap may be low-ish, so 10Hz addition is more realistic. Quite well motivated: we need to validate the inclusive lines behaviour and these are the first sprucing lines on top of the converted photon radiative inclusive lines targeting converted photons.
Edited by Fionn Caitlin Ros Bishop