SLB - Changes ahead of 2025 data taking
Description
This common SL MR is intended for changes to SL lines and builders to be merged ahead of data-taking in 2025 to reduce further lines with high rates, improve tape storage, and a few other fixes.
List of changes
As follows, the list of changes included by each MRs
| Changes | MR | Impact on BW |
|---|---|---|
| Fix line names and decay descriptor | !4437 (merged) | None |
| Changes to b \to u l \nu lines | !4440 (merged) | Reduction |
| Baryonic \tau hadronic lines | !4431 (merged) | Reduction |
| Fake muon definition | !4520 (merged) | Increase |
| HLT1 filtering at HLT2 level | !4525 (merged) | Reduction |
| Changes to PID requirements in b\to l\gamma DD | !4573 (merged) | Small increase |
| Removal to b \to K \tau \nu lines and relaxing P_T requirements for \mu and e | !4589 (merged) | Not known |
| Increase of mass windows of J/\psi to include \psi(2s) | !4619 (merged) and !4623 (merged) | Increase |
| Optimise the selections for Bc2Bspi and Bc2Bsmunu | !4651 (merged) | Reduction |
| Prescale the LbToLcENu HLT2 line | Committed in master | Reduction |
| Tuning of XbToXcTauNu | !4661 (merged) | Reduction |
| Other tuning | !4664 (merged) and !4663 (merged) | Reduction |
| Split fake muon definition | !4676 (merged) | Reduction |
| Split B \to K \tau \nu lines from B \to K e/\mu \nu | !4679 (merged) | Reduction |
Deadlines
Please be aware that all the changes provided in your own branch should be included in this MR before the SL internal deadline, to have time to trigger an integration test and study the output.
- SL deadline: 21/03/25
- RTA deadline: 28/03/25
- 14/04/25
Changes in BW
Estimated impact in BW and rates for SL lines