Remaining fixes for bandq 2025 operation
This MR collects a few remaining developments (issues listed in #949 ) for bandq selection lines for 2025 data-taking.
It includes:
- Tightening photon PT cut.
- Tuning of SameSign dimuon lines. Tighter PID and/or PT selection, add c.c. to enable the
mu- mu-combination, tighter the prescale factors. - Bug fix for DoubleCharmSpectroscopy sprucing.
- Fix some name convention issues.
- Manually define the stream of the sprucing lines
- [To be added by !4762 (merged)]: stream splitting for new turbo lines
Edited by Mengzhen Wang