BnoC final collections for start of 2025 data-taking
Implemented for 14th April:
BnoC top 20 line tunings
BdsToKstzKstzb - !4713 (merged) - halves bandwidth of top BnoC HLT2 Turbo line by tightening track ghostprob + chi2dof
New lines
!4235 (merged) - 6 new HLT2 Tubo lines -- assigned "bnoclow" stream
BdsToEtapKS_etaToGG_DD(/LL)BdsToEtapKS_Gamma_DD(/LL)-
BdsToEtapKS_Resolved_DD(/LL)- Bandwidth of 6 lines expected to total 5.36 MB/s (includes calo, flavour tagging, pv_tracks persitency)
!4594 (merged) - Two new Sprucing lines for 2025 data-taking
-
BuToKpPi0_Dalitz,BuToPipPi0_Dalitz- pi0->eegamma
- Bandwidth estimate: 35 (KB/s)
- Rate estimate: 0.4-0.6 Hz
- pi0->eegamma
Isolation update
!4701 (merged) - Update BnoC isolation options
- Update bnoc_isolation module to include extra filtering for vertex isolation
- Add isolation to HLT2 Turbo lines that request it (survey + extra requests)
- Minimal cone isolation to those not requesting it (Turbo default, no extra persistency mostly): CONE_MULT CONE_PX[Y,Z]
- Add vertex isolation to a number of lines (new information)
- Totals 40 lines
- No measured bandwidth change across all BnoC lines from local test
, !4730 (merged) - Add isolation reltables to 2 HLT2 Turbo lines, BdsToPpPpPmPm BdsToPpPm
, !4747 (merged) - Add isolation reltables to BnoC baryonic lines (from Turbo default, no extra persistency)
- Bandwidth measurement: +2% in baryonic lines
- Throughput change: < 0.1 %
Considered for future deadline
Kshh lines - !4716 (closed) - tighten ghost and chi2dof track cuts
BdsToL0L0bar lines - !4648 (closed) - tune lines
!4460 - new bdstolambdaph lines
Edited by Francesca Swystun