Prepare new global tag for upgrade studies
This is to define what need to be picked up for a new global tag to be deployed for productions for upgrade studies.
Note that some MR are coupled to MR in SIMCOND and will be required to be deployed in a synchronised global tag, described in SIMCOND#7 (closed)
Other MR may require MR in Boole or Gauss to become active
.
The next tag should include
-
!58 (merged) UT materials -
!60 (merged) New PMT readout maps (requires SIMCOND!115 (merged), lhcb/LHCb!2664 (merged), lhcb/Boole!289 (merged)) -
!61 (merged) RICH simulation input update (requires lhcb/Gauss!646 (merged) and SIMCOND!116 (merged)) -
!62 (merged) fix typo in SciFi materials -
!63 (merged) VP sensor/ASIC dimensions and positions -
!64 (merged) VP module material updates -
!65 (merged) VP RF foil thinning
Edited by Gloria Corti